WME Boom
  • Profile
  • Our People
  • Expertise
    • AV/IT + Security Engineering
    • Building Information Modeling
    • Building Services
    • Roads + Infrastructure
    • Structural Engineering
    • Sustainable Building
  • Projects
    • All Projects
    • Building Performance
    • Civic
    • Commercial
    • Education
    • Historic
    • Hospitality
    • Industrial
    • Refurbishment
    • Residential
    • Retail
  • Solutions
  • News
  • Careers
  • Contact
  • Visit WME Global

Very pleased to read our contribution to the CIBSE Journal published in this month’s issue on Soft Landings and closing the performance gap.

James Warne talks about focusing on key elements affecting the success of the project in the initial workshops, issues such as overheating or fire safety can be tackled by the whole team – not in silos, but holistically.

https://www.cibsejournal.com/general/how-industry-is-using-soft-landings-to-help-close-the-performance-gap/

  • Previous PostWe are currently recruiting engineers.

  • Next Post‘LUMA Concept Hotel’ opens in West London

Share Tweet Share
WME Boom Logo
Copyright © 2020 WME Global
All rights reserved.
  • Profile
  • Our People
  • Expertise
    • AV/IT + Security Engineering
    • Building Information Modeling
    • Building Services
    • Roads + Infrastructure
    • Structural Engineering
    • Sustainable Building
  • Projects
    • All Projects
    • Building Performance
    • Civic
    • Commercial
    • Education
    • Historic
    • Hospitality
    • Industrial
    • Refurbishment
    • Residential
    • Retail
  • Solutions
  • News
  • Careers
  • Contact
  • Visit WME Global

WME Boom

Mindspace Aldgate
114 Whitechapel High Stree
London E1 7PT
United Kingdom

T: +44 20 3637 2722
E: info@wmeboom.com